KORONG VALE

KORONG VALE The Korong Vale Primary Disinfection Upgrade project required the installation of a new Filtered Water Balance Tank, re-lift pumping station, UV disinfection reactors and control building, chlorine contact tank and multiple process ties.  This upgrade allowed the site to transfer from its primary disinfection method, which relied on

Read More

HUME DAM PENSTOCK REFURBISHMENT

HUME DAM PENSTOCK REFURBISHMENT One of the largest dams in the world, the Hume Dam is the major catchment area for the Murray River, playing a critical role in the control and regulation of water flow along the Murray River. RCE Australia was contacted by Diona to refurbish the four

Read More

BURRINJUCK DAM CABLE CRANE

BURRINJUCK DAM CABLE CRANE The cable crane at Burrinjuck Dam was first used back in 1911, when the foundation of the dam was first laid. Originally, it was steam powered. RCE Australia was contracted to install a completely new automation and control system on the crane, including safety devices, wireless